All case studies

Give the supplier the release package, not the whole R&D archive

Give a supplier the approved prototype package while keeping internal R&D and the next revision inside the engineering team.

Industry
Manufacturing and engineering
Proposed boundary
One Vault per supplier program
Products used in this design
Secure File Storage, Structured Ingots

Problem

A manufacturer needs an outside supplier to evaluate a prototype revision. The working archive also contains internal test failures, cost assumptions and unreleased alternatives. A broad shared folder blurs the release boundary.

Solution

Separate the internal program Vault from the supplier exchange. Engineering selects the exact release; the supplier receives that package and a defined return path.

Access plan

Proposed access plan for Manufacturing and engineering
CollectionContainsProposed access
Program VaultWorking designs and test interpretationNamed engineering DVAKs
Supplier exchangeApproved revision packageChosen recipient access
Supplier intakeReturned filesUpload-only submission
Processing serviceIntended program inputsDedicated NHI delegation

Expected outcome

  • Supplier collaboration can continue without opening the working archive.
  • Each release has a deliberate scope instead of inheriting folder access.

Buyer fit

Engineering teams extending a system they already control, with a confidentiality requirement beyond their current PLM or supplier platform.

Pilot and limits

Use fictional revisions and two programs. Test supplier intake, another program’s file identifier and a retired processing credential. A Vault grant is not a per-folder policy. Revision acceptance and release approval remain engineering decisions; authorized recipients can retain downloaded copies.

Product references:

Map one prototype handoff.

Free accounts start with Sparks. Storage and other product plans are separate.